Wilderdog

Pacific Blue Reflective Long Lead - 30ft

Pacific Blue Reflective Long Lead - 30ft - Main image
$24 $48 In stock

Category: 攀岩繩狗牽繩

還在為召回訓練煩惱嗎?選用30英尺的牽繩,讓您的狗狗有更多活動空間,同時確保牠的安全。我們的長牽繩也非常適合露營時作為固定繩使用。(*請勿讓狗狗在無人看管的情況下使用固定繩!)

  • 長度:30英尺
  • 採用緊密編織的聚丙烯/聚酯纖維材質,繩徑為5/16英寸
  • 編織反光絲線,適合在低光源或無光源環境下使用
  • 鋁製旋轉扣環,可旋轉並鎖定
    • 扣環寬度:1.5英寸
    • 扣環長度:2.5英寸
    • 額定承重:3 kN
  • 適合所有犬種

Customer Reviews (4.7 / 5 · 3 reviews)

Ellie ★★★★★

The clip on this leash feels solid enough that I don't worry about it slipping when my pup hits the end of the line mid-sprint. The 30 feet gives her just enough freedom to explore the field while I can still reel her in for a quick pause.

Adam ★★★★★

The 30-foot length is perfect for letting my pup explore the field without losing him, and the blue reflective stitching is a nice safety touch for evening walks. It's lightweight but feels sturdy in my hand, and I've already used it as a tie-out while camping—works great for that too. My only "comp

Eva ★★★★☆

The reflective stitching along the whole 30 feet is a nice touch for evening walks, and the length gives my pup plenty of room to sniff without me worrying about traffic. Only gripe is the rope feels a bit stiff at first, but it loosens up after a few uses.